Minimum Wages and Revised Rates of Variable Dearness Allowance for Industrial Workers of Stone Mines w.e.f 1st Oct 2025

Minimum Wages and Revised Rates of Variable Dearness Allowance for Industrial Workers of Stone Mines w.e.f 1st Oct 2025

Minimum Wages and Revised Rates of Variable Dearness Allowance for Industrial Workers of Stone Mines w.e.f 1st Oct 2025

File No.1/6(7)2025 LS-II
Government of India
Ministry of Labour& Employment
Office of the Chief Labour Commissioner(C)
New Delhi

Dated: 25/09/2025

ORDER

In exercise of the powers conferred by Central Government vide Notification No. S.O. 189(E) dated 19th January, 2017 of the Ministry of Labour and Employment the undersigned hereby revise the rates of Variable Dearness Allowance on the basis of the average Consumer Price Index for Industrial workers reaching 413.42 from 402.09 as on 31.12.2024 (Base 2016–100) and thereby resulting in an increase of 11.33 points. The revised Variable Dearness Allowance as under shall be payable from 01.10.2025:-

Rates of VDA for employees employed in “STONE MINES” shall be as under:

Item of workRates of Variable Dearness Allowance as on 01.10.2025
1. Excavation & removal of over burden with 50 meters lead/ 1.5 meters lift. *
(i) Soft SoilRs.194
(ii) Soft Soil with rockRs.287
(iii) RockRs.380
2. Removal and stacking of rejected stones with 50 metres lead/ 1.5 Meters lift. *Rs.155
3. Stone breaking or Stone Crushing for the Stone size of:-
1.0 inch to 1.5 inchesRs.1152
Above 1.5 inches to 3.0 inchesRs.985
Above 3.0 inches to 5.0 inchesRs.581
Above 5.0 inchesRs.479

Therefore, the minimum piece rate wages showing the basic and Variable Dearness Allowance payable w.e.f. 01.10.2025 to the employees employed in Stone Mines shall be as under-

CategoryBasic WagesVDATotal
1. Excavation & removal of over burden with 50 meters Lead/1.5 Meters lift.*
(i) Soft SoilRs.351+ Rs.194= Rs.545
(ii) Soft Soil with rockRs.531+ Rs.287= Rs.818
(iii) RockRs.703+ Rs.380= Rs.1083
2. Removal and stacking of rejected stones with 50 meters lead/1.5 meters lift.*Rs.283+ Rs.155= Rs.438
3. Stone Breaking or Stone Crushing for stone size of category **
Basic WagesVDATotal
(i) 1.0 inch to 1.5 inchesRs.2171+ Rs1152= Rs.3323
(ii) Above 1.5 inches to 3.0 inchesRs.1857+ Rs.985= Rs.2842
(iii) Above 3.0 inches to 5.0 inchesRs.1088+ Rs.581= Rs.1669
(iv) Above 5.0 inchesRs.893+ Rs.479= Rs.1372

The workers employed on minimum guaranteed time rate of wages per day shall be entitled to time rate of minimum wages plus special allowance, if any, for unskilled category of above ground workers revised from time to time by the Central Government in respect of scheduled employment in stone mines.

* Per 2.831 cube meters (100 cubic feet)
** Per truck load of 5.662 cubic meters (200 cubic feet)

(Ashutosh A.T Pednekar)
Chief Labour Commissioner(C)

Click to view/download PDF

Follow us on Telegram ChannelTwitter and Facebook for all the latest updates

COMMENTS